NewsSelect previous archives: 2009 |2008 |2007 |2006 |2005 |2004 |2003 |2002 |2001 | 24 June 2009![]() GE and Boeing Implement Industry Standard: Open System Architecture for Condition-Based Maintenance 24 June 2009![]() The MINT project takes a step toward a more environmental air 16 June 2009![]() GE’s Dowty business delivers 600th Dash 8 Q400 Propeller System 15 June 2009![]() GE Qualifies and Delivers Boeing P-8A Poseidon Systems 14 June 2009![]() GE’s integrated cockpit demonstrates cost and environmental benefits 14 June 2009![]() GE and SAFRAN Appoint Steve Walters as President |
|
|
Select previous archives: 2009 |2008 |2007 |2006 |2005 |2004 |2003 |2002 |2001 |

GE and Boeing Implement Industry Standard: Open System Architecture for Condition-Based Maintenance
June 24, 2009 – Grand Rapids, MI – Boeing and GE Aviation have jointly developed a simpler method to implement condition-based maintenance systems on aircraft. It is called the Open System Architecture for Condition-Based Maintenance (OSA-CBM).

The MINT project takes a step toward a more environmental air
On 16th of June when Novair flight NVR352 from Zakinthos received clearance to fly the Required Navigation Performance (RNP) decent and approach into Stockholm Arlanda runway 01R a step to more efficient and environmental air transport system was taken.

GE’s Dowty business delivers 600th Dash 8 Q400 Propeller System
Le Bourget – June 16, 2009 – GE Aviation’s Dowty business recently delivered the 600th propeller system for the Bombardier Dash 8 Q400 aircraft. The advanced six-bladed propeller system for the Dash 8 has single removable all-composite blades.

GE Qualifies and Delivers Boeing P-8A Poseidon Systems
Le Bourget – June 15, 2009 – GE Aviation recently achieved two significant P-8A milestones including flight management system hardware qualification and deliveries of stores management system hardware.

GE’s integrated cockpit demonstrates cost and environmental benefits
June 14, 2009 – Le Bourget - GE’s integrated cockpit at the Paris air show incorporates a large area display suite and the flight management system (FMS) demonstrating the capability to fly precision and optimized descent arrivals

GE and SAFRAN Appoint Steve Walters as President
June 14, 2009 – GE and SAFRAN today announced the appointment of Steve Walters as the president of their Middle River Aircraft Systems/Aircelle joint venture